Prefabricated Concrete Slabs

When prefabricated concrete slabs are used in building constructions Socket base is usually installed at the slab edge for attachment of edge protection. In the Socket base Post 1,3 m is installed and thereafter Barrier 2,6. The Barrier can be raised in one simple operation on the post up to a height of 310 mm above the floor structure, without decreased safety. This creates conditions for joint grouting, casting and other common work tasks without any need of uninstalling the edge protection.